Arrival
- Confirm the previous shift's close was completed
- Confirm the fryer was filtered and the oil condition is acceptable
- Record cooler and freezer temperatures
- Confirm the day's production plan and any special orders
- Confirm catering, wholesale, and pre-orders for the morning
- Review yesterday's sell-through and sell-out times
- Confirm all ingredients are in stock for the plan
- Turn on the fryer and proof box to bring to temperature
Starting the fryer first is the timing decision the whole night runs on. It takes time to reach temperature and everything after it waits.
Mixing
- Confirm all ingredients are within date
- Scale every ingredient by weight, not by volume
- Confirm water and dough temperature against the target
- Mix to the specified time and development, not by appearance alone
- Confirm the dough temperature at the end of mixing
- Record the batch and any deviation
Dough temperature is the variable that decides proof time. A dough that comes off the mixer four degrees warm will proof faster than the schedule assumes, and the crew will not notice until the product is over-proofed.
Bench and Cutting
- Confirm the bench is clean and lightly floured
- Rest the dough per the recipe before working
- Sheet to the specified thickness
- Cut consistently and confirm piece weight
- Place on trays with correct spacing
- Track which racks went into the proofer at what time
- Handle scrap dough per the standard rather than reworking indefinitely
Piece weight is the food cost control in a donut shop. A cutter set slightly loose costs a percentage on every single unit, every day.
Proofing
- Confirm proof box temperature and humidity
- Record the time each rack enters the proofer
- Proof to appearance and feel, not to the clock alone
- Check the first rack early to calibrate the night's timing
- Rotate racks if the box proofs unevenly
- Never leave the proofer unattended past the check interval
Over-proofed dough is the single most common overnight failure. It looks correct in the box and collapses in the fryer, and the entire rack is loss.
Frying
- Confirm the oil temperature is at the target before the first drop
- Confirm the oil is clean and filtered
- Fry in consistent batch sizes so temperature does not drop
- Confirm the flip timing and total time per side
- Watch for color and adjust to the actual product, not the timer alone
- Allow oil to recover between batches
- Record the oil temperature periodically
- Skim debris between batches
Oil temperature recovery is what separates an even case from a mixed one. Overloading the fryer drops the temperature, and the product absorbs oil instead of frying.
Cake Donuts and Other Products
- Mix cake batter to the specified consistency
- Confirm the depositor is set for correct weight
- Confirm oil temperature for cake, which differs from yeast product
- Fry to the specified time and color
- Confirm the product is cooked through at the center
Finishing
- Cool product to the correct temperature before glazing
- Confirm glaze consistency and temperature
- Glaze evenly with consistent coverage
- Allow glaze to set before stacking or icing
- Ice, fill, and top per the product specification
- Confirm fillings are held at the correct temperature
- Confirm all toppings are fresh and stored correctly
- Confirm allergen-containing products are handled separately
Glaze temperature is a quality variable most shops treat as fixed. Too warm and it runs off; too cool and it sits thick and sets cloudy.
Filling and Specialty
- Confirm filling equipment is clean and sanitized
- Confirm filling weight per unit
- Confirm the correct filling for each product
- Confirm filled products are marked or arranged so they are identifiable
- Confirm cream and custard products are held at temperature
Case Setup
- Build the case in the standard planogram
- Place the highest-margin and best-selling items at eye level
- Confirm every variety has correct signage and pricing
- Confirm quantities per variety match the production plan
- Face and arrange for appearance
- Confirm the case is clean, inside and out
- Stage backup product for restocking through the morning
A case that looks abundant at 6 a.m. sells faster than one that looks picked over, even with the same product count. Build it full and restock from the back.
Wholesale and Pre-Orders
- Confirm every pre-order against the ticket
- Box and label each order with the customer name and pickup time
- Confirm wholesale orders are packed to the account's specification
- Stage orders separately from retail product
- Confirm delivery timing and driver assignment
- Confirm nothing staged for an order is sold from the case
Selling a pre-order out of the case is the most common failure in a busy morning. Stage them physically apart.
Cleaning During Production
- Clean the mixer and bowl after each batch
- Keep the bench clear between products
- Clean the depositor after use
- Wipe glaze and topping stations as work moves
- Keep floors clear of flour and sugar for safety
End of Production
- Filter the fryer oil
- Record oil condition and any change or top-off
- Clean and sanitize all equipment
- Clean the proof box
- Clean the bench and all work surfaces
- Sweep and mop the production floor
- Record production quantities by variety
- Record any waste and the reason
- Confirm ingredient levels and place the order
- Record all temperatures
Recording production by variety against yesterday's sell-through is how the production plan improves. A variety that sells out at 8 a.m. every day is under-produced and a variety with six left at close is over-produced.
Handoff to Morning Staff
- Confirm the case is complete and the morning crew knows what is where
- Confirm what is staged for pre-orders and wholesale
- Confirm which varieties are short and which are heavy
- Confirm any product still finishing
- Note any equipment issue for the day crew
- Confirm restocking backups and where they are
The handoff note is what makes the morning work. A morning crew that does not know what is behind them will sell out of the case rather than restocking from it.
Weekly
- Deep clean the fryer, including boil-out per schedule
- Change the fryer oil per the schedule and record it
- Calibrate scales and thermometers
- Deep clean the proof box
- Review production against sales by variety
- Review waste percentage
- Confirm all food handler certifications
- Confirm pest control service
How MyTeamTasks Helps
An owner who is asleep while the entire day's product is made cannot verify that proof times were tracked or that the oil was filtered. A shared task system runs the overnight production routine on the baker's phone with timestamps at each stage, captures the production and waste counts as they happen, and holds the handoff note where the morning crew reads it. The owner arrives to a record of the night rather than to a guess based on what the case looks like.